Concrete Slab Calculator

Calculate the amount of concrete needed for your slab project. Enter the slab dimensions to estimate the concrete volume and the number of cubic yards required.

FREE CONSTRUCTION CALCULATOR

Concrete Slab Calculator

Estimate the concrete needed for your slab. Enter your slab area, choose the thickness, and get the total volume in cubic yards, cubic feet, and cubic meters.

1 Choose Measurement Units
2 Enter Your Slab Size
Example: A 20 × 20 foot slab has an area of 400 square feet.
Example: A 6 × 6 meter slab has an area of 36 square meters.
3 Select Slab Thickness
4 Add Extra Concrete
Used to account for minor waste and measurement differences.

Your Concrete Estimate

Calculated from your slab dimensions and selected thickness.

TOTAL CONCRETE WITH ALLOWANCE
0.00 yd³
Cubic yards
▣
Slab Area 0 sq ft
Thickness 4 inches
Base Volume 0.00 yd³
Cubic Feet 0.00 ft³
Cubic Meters 0.00 m³
Waste Allowance 10%
Ordering tip: The final amount includes your selected extra allowance. Actual concrete requirements can vary depending on the ground, slab thickness, and site conditions. Confirm the final quantity with your concrete supplier.

Compare Different Slab Thicknesses

Thickness Concrete Needed

A concrete slab may look simple, but getting the concrete quantity right starts with three measurements: length, width, and thickness.

Use the calculator above to find the volume of concrete required for a rectangular slab. Enter your dimensions in feet and inches or metric units, and the result will show how much concrete you need in the selected volume unit.

The calculation can be useful when planning a new slab, checking a contractor’s estimate, or working out how much ready-mix concrete to order.

Concrete Slab Calculation at a Glance

For a rectangular slab, the calculation is straightforward:

Concrete volume = Length × Width × Thickness

The important part is making sure all three measurements are expressed in compatible units before calculating.

If you are working in feet and inches and want the answer in cubic yards:

Cubic yards = Length × Width × Thickness ÷ 324

Here, length and width are measured in feet, while thickness is measured in inches.

Example

Suppose your slab is:

  • Length: 24 feet
  • Width: 12 feet
  • Thickness: 4 inches

The calculation is:

24 × 12 × 4 ÷ 324 = 3.56 cubic yards

So the slab contains approximately 3.56 cubic yards of concrete before allowing for extra material.

concrete slab calculator

How Much Concrete Does Your Slab Need?

The size of the slab is only part of the calculation. Thickness makes a major difference.

Consider a 20 × 20 foot slab:

Slab thicknessApprox. concrete
3 inches3.70 cubic yards
4 inches4.94 cubic yards
5 inches6.17 cubic yards
6 inches7.41 cubic yards
8 inches9.88 cubic yards

These figures represent the calculated slab volume without an additional waste allowance.

This is why entering the actual planned thickness is important rather than using a standard thickness automatically.

What Measurements Do You Need?

You only need three dimensions for a basic rectangular slab.

Length

Measure from one end of the slab to the other.

Width

Measure across the slab at a right angle to the length.

Thickness

Measure the depth of the concrete slab.

If the slab has different thicknesses in different areas, a single calculation may not accurately represent the entire project. In that situation, calculate the individual sections separately.

A Quick Way to Estimate Concrete

If you already know the slab’s area in square feet, you can make the calculation even quicker.

For a 4-inch-thick slab, every square foot requires approximately:

0.01235 cubic yards of concrete

So:

Slab area × 0.01235 = cubic yards

For example, a 500-square-foot slab at 4 inches thick:

500 × 0.01235 = 6.17 cubic yards

This is the theoretical volume before adding extra concrete.